Skip to main content

One doc tagged with "termination time"

View All Tags

Case Control

The analysis will run for a maximum number of cycles or length of time, checking periodically to see if the out of balance or “residual” forces are smaller than the limits set. If they are the model is said to have converged and the analysis stops.